Not Sure if You Want a Concrete Driveway?
How long it takes to lay a concrete driveway will depend on the extent and complexity of the project, the expertise of the contractors that you hire, and the overall condition of your driveway. Typical concrete projects for residential use can take between 1-3 days. Curing time, however, will add to the time required before new concrete can be walked or driven on.
Concrete Paving
If you choose a driveway that is made from concrete, the surface will last longer if the concrete has been built on a solid, level, well-drained soil base. A gravel base will be laid and inspected by the concrete crew. Once they build up forms that determine the shape of the concrete, it is ready for pouring. The concrete will then be poured followed quickly by what is known as screeding. This is why a flatboard, power tools, and hand tools are used to smooth and flatten the surface.
Factors to Consider When Choosing Concrete Driveways
- Thickness: An even thickness is critical to prevent cracks from appearing over time. How thick it should be is determined by the contractor, based on a few questions they will ask. Thickness will also be determined by what sort of vehicle the driveway will be supporting. There could be more than the average car involved.
- Mixture: There are several options to consider, and this is when it gets a bit daunting. There are three tips to be aware of. First, you need to know the difference between concrete and cement. Cement is only one ingredient. To make concrete, you need cement, gravel, sand, and water. Having the right proportions of these materials is vital when it comes to strength.
If you would like to make an appointment to discuss a concrete driveway project, please contact Armas Concrete LLC. Call us today at (253) 262-5038. We’re happy to take on your project if you live in or around the Maple Valley, WA region.